KitLog pro

Powered By Kitlog Pro v2.0

Marks Web Site
' style=
Date:  8-30-2009
Number of Hours:  5.75
Manual Reference:  8-x
Brief Description:  Wiring securing and protecting...

Today was a mixed work day. My brother Bernie and I started with the securing of the fuel quantity indicating system adapter harness. While we were working under the panel we secured and spiral wrapped more wiring at potential chafe points. To finish off with wiring to do items we secured the wiring for the aileron trim servo and control stick harness with tie wraps and heat shrink. Next we worked on the engine breather tube installation but had difficulties and kinked the tube so a new one is on order from Van's. Lastly we prepared and installed the rudder control cable fuselage exit point fairing.
' style=

Spiral wrap added to protect wiring

Spiral wrap added to protect wiring

' style=

Wiring secured and connector heat shrink added

Wiring secured and connector heat shrink added

' style=

Rudder control cable fuselage exit fairing installed

Rudder control cable fuselage exit fairing installed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.